ARR 3002 was on the point         
ARR 3002 had been on the point of the eb PNWR "Toledo Hauler," but had been disconnected before I could get a photo. You can see that the roof headlights are still on, and PNWR 3002 is directly behind it on Engine Track 1. ARR 3002 had spent two days as the PNWR "Toledo Switcher" before returning to the Toledo Hauler. The morning after this photo, ARR 3002 was placed into service on the PNWR "Westsider."
Date: 2/23/2008 Location: Albany, OR   Map Show Albany on a rail map Views: 313 Collection Of:   Charles Bonville
Locomotives: ARR 3002(GP40-2)    Author:  Charles Bonville
ARR 3002 was on the point
Picture Categories: Yard This picture is part of album:  Highlights of 2008
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1060832